Page 1 of 3 123 LastLast
Results 1 to 10 of 29
  1. #1
    Senior Member Paul65K's Avatar
    Join Date
    May 2013
    Location
    Lake Havasu City/Havasu Palms
    Posts
    3,998

    Guess what I've been doing??

    Name:  IMG_0884.jpg
Views: 244
Size:  96.4 KB

    Can anyone figure out what I'm doing here???

  2. #2
    Senior Member Joker's Avatar
    Join Date
    Oct 2012
    Location
    Huntington Beach/Bullhead City
    Posts
    781
    Quote Originally Posted by Paul65K View Post
    Name:  IMG_0884.jpg
Views: 244
Size:  96.4 KB

    Can anyone figure out what I'm doing here???
    Trying to electrocute yourself?

  3. #3

    Guess what I've been doing??

    Making a hell of a mess so u can call a real electrician to fix ur shit.

  4. #4
    Quote Originally Posted by Joker View Post
    Trying to electrocute yourself?
    x2 LOL

  5. #5
    WESTERNAERO
    Guest
    Is that for solar panels? What's going on in the sub-panels?

  6. #6
    Senior Member Paul65K's Avatar
    Join Date
    May 2013
    Location
    Lake Havasu City/Havasu Palms
    Posts
    3,998
    Quote Originally Posted by Joker View Post
    Trying to electrocute yourself?
    Hey John..............

  7. #7
    Senior Member Joker's Avatar
    Join Date
    Oct 2012
    Location
    Huntington Beach/Bullhead City
    Posts
    781
    Quote Originally Posted by Paul65K View Post
    Hey John..............

  8. #8
    I'd wager you're installing a backup emergency generator with an automatic transfer switch that will allow it to feed the new sub-panel and important branch circuits.
    Must be a fairly large genny !!

  9. #9
    Senior Member Paul65K's Avatar
    Join Date
    May 2013
    Location
    Lake Havasu City/Havasu Palms
    Posts
    3,998
    Quote Originally Posted by Taboma View Post
    I'd wager you're installing a backup emergency generator with an automatic transfer switch that will allow it to feed the new sub-panel and important branch circuits.
    Must be a fairly large genny !!
    Ding, Ding, Ding.......We have a winner

    We are actually installing a 14KW natural gas, standby generator and isolating the key circuits into a sub panel. There are 16 circuits in total, we've been at it for almost 2 full days and hope to have it wrapped up by noon tomorrow. The biggest challenge was getting the wire to the Generator which is about 70' away from the panel

    We should be able to run most of the things in the house if we lose power including the central air conditioning and most importantly the wine coolers..........I'm guessing we'll be kind of popular if the power goes out when it's 110 outside

  10. #10
    Quote Originally Posted by Paul65K View Post
    Ding, Ding, Ding.......We have a winner

    We are actually installing a 14KW natural gas, standby generator and isolating the key circuits into a sub panel. There are 16 circuits in total, we've been at it for almost 2 full days and hope to have it wrapped up by noon tomorrow. The biggest challenge was getting the wire to the Generator which is about 70' away from the panel

    We should be able to run most of the things in the house if we lose power including the central air conditioning and most importantly the wine coolers..........I'm guessing we'll be kind of popular if the power goes out when it's 110 outside
    Can you please hurry? I've got no one to give me shit around here! I've kinda missed your smart ass!


    Sent from my Bat Cave!!!

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •