Results 1 to 10 of 16

Thread: MS Excel ?

Hybrid View

  1. #1
    Quote Originally Posted by Carbon View Post
    How about when entering a date? It wants to progress to next day. Can I change something to copy same date?
    You can also enter the same data in two cells, say A1 & B1, highlight both cells, then drag the lower right across to the left.

  2. #2
    Quote Originally Posted by Hotboat View Post
    You can also enter the same data in two cells, say A1 & B1, highlight both cells, then drag the lower right across to the left.
    Yea, I figured that out in post 7. What is the absolute reference? Sorry I'm self teaching here.
    CH3NO2

  3. #3
    Quote Originally Posted by Carbon View Post
    Yea, I figured that out in post 7. What is the absolute reference? Sorry I'm self teaching here.
    The dollar sign: $. So if you want to fix A1 so it doesn't update, enter: $A$1. If you want to fix only A, enter: $A1 and vice versa

  4. #4
    Quote Originally Posted by Hotboat View Post
    The dollar sign: $. So if you want to fix A1 so it doesn't update, enter: $A$1. If you want to fix only A, enter: $A1 and vice versa
    I'm lost here, but date isn't a big deal. I can do what I what I described in post 1. Maybe I will re-read this tomorrow and get it.
    CH3NO2

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •