-
Senior Member
Ok, made some progress today. Got the new starter in, and buttoned up the trans after having to grind shift linkage bracket to clear pan.
Here's my updated to do list.
1. Install trans cooler.
2. Add trans fluid.
3. Order new radiator rubber.
4. Install fan and shroud.
5. Install new to this car Griffin Radiator. It's narrower so I'll likely need at least one new hose.
6. Prime Engine
7. Install distributor and route and secure wires.
8. Tie up loose ends with carburetor (return spring, throttle bracket and throttle connect) and install 82 and 84 jets.
9. Start and adjust engine checking for leaks and set timing and pray for good oil pressure.
10. Road test and adjust as necessary.
11. Drive down to Rogers Exhaust shop in Fontana and drop $700 on complete 3" exhaust.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
All times are GMT -7. The time now is 07:17 PM.
vBulletin Skin By: PurevB.com
|
Bookmarks