Attachment 28008
Can anyone figure out what I'm doing here???:signhuh:
Printable View
Attachment 28008
Can anyone figure out what I'm doing here???:signhuh:
Making a hell of a mess so u can call a real electrician to fix ur shit. :)
Is that for solar panels? What's going on in the sub-panels?
I'd wager you're installing a backup emergency generator with an automatic transfer switch that will allow it to feed the new sub-panel and important branch circuits.
Must be a fairly large genny !!
Ding, Ding, Ding.......We have a winner :thumb:
We are actually installing a 14KW natural gas, standby generator and isolating the key circuits into a sub panel. There are 16 circuits in total, we've been at it for almost 2 full days and hope to have it wrapped up by noon tomorrow. The biggest challenge was getting the wire to the Generator which is about 70' away from the panel :grumble
We should be able to run most of the things in the house if we lose power including the central air conditioning and most importantly the wine coolers..........I'm guessing we'll be kind of popular if the power goes out when it's 110 outside :action-smiley-035: