Complete 3 car Garage remodel. gutted everything and put it in a container in the driveway. All new electrical including 125amp subpanel, 220 for welders, 220 for air conditioning and 220 for new 60 gallon Compressor (with maxline pre-plumb throughout garage), 2 new 20 amp circuits for receptacles, new 20 amp for landscape lighting transformer. lighting for 10 new fluorescent shop lights, and outside flood lights. getting insulated (R-38 ceilings and R-15 walls). complete re-drywall, texture and paint and an Epoxy floor. Wet Bar with refer, and 32" LCD TV on the wall. All new cabinets and Stainless steel Bar top and bench tops. Shooting for a mid February completion.
2nd project; BOAT
Drive rebuild and install external steering, install new gauges, replace rub-rail. Along with the usual repair work... hopefully done by Desert Storm
My winter project is me and I'm not even close to getting it done...bikini weather will be here before you know it!
My winter project is me in a thong! I'm gonna do it if it kills me. I've pretty much committed to wearing one...it's up to me to look good or make an ass of myself
My winter project is me in a thong! I'm gonna do it if it kills me. I've pretty much committed to wearing one...it's up to me to look good or make an ass of myself
Sent from my Bat Cave
Well you're off to a good start...you don't see me dragging my ass out of bed to workout at 4:30am!
Bookmarks