Page 295 of 560 FirstFirst ... 195245285293294295296297305345395 ... LastLast
Results 2,941 to 2,950 of 5598
  1. #2941
    Quote Originally Posted by Stainless View Post
    These are support towers for a steam generation system. 110' to tip of lifting frames. That boom lift is 120' capability at $1000/day. Crane is about $2500/day.


    CH3NO2
    You should rent the 120' by the month. We have one so far on a job and its 10K a month. Problem is the wheels go out from 8' to 12' wide after going up 20' and it makes it a tight fit where we are working.

  2. #2942
    Quote Originally Posted by Bobby V View Post
    You should rent the 120' by the month. We have one so far on a job and its 10K a month. Problem is the wheels go out from 8' to 12' wide after going up 20' and it makes it a tight fit where we are working.
    Yea, we only need it for a week. This one expands to 12' width also, we are blessed with plenty of room and level ground.
    What are you putting together that high?


    CH3NO2
    CH3NO2

  3. #2943
    Name:  ImageUploadedByTapatalk1398285818.198239.jpg
Views: 159
Size:  120.6 KB right in the middle of rush hour and Dodger game traffic,the hook





    Sent from space somehow

  4. #2944
    Senior Member BrenMoto's Avatar
    Join Date
    Oct 2013
    Location
    Long Beach
    Posts
    241
    Quote Originally Posted by Teded View Post
    Name:  ImageUploadedByTapatalk1398285818.198239.jpg
Views: 159
Size:  120.6 KB right in the middle of rush hour and Dodger game traffic,the hook





    Sent from space somehow
    Oh that sucks.....


    Sent from this purdy mouth

  5. #2945
    Quote Originally Posted by Stainless View Post
    Yea, we only need it for a week. This one expands to 12' width also, we are blessed with plenty of room and level ground.
    What are you putting together that high?


    CH3NO2
    We are installing over 1200 fire sprinklers in an old battery smelter building in Vernon. Peak is 80' in one building and 55' in another. Problem is we have to articulate over some structures inside.

  6. #2946
    Senior Member BrenMoto's Avatar
    Join Date
    Oct 2013
    Location
    Long Beach
    Posts
    241
    big ass water tank our special fx and construction crew are building, next we put a submarine in there for next week shoot at Paramount Studios


    Sent from this purdy mouth

  7. #2947
    Senior Member niceguyeddie's Avatar
    Join Date
    Oct 2012
    Location
    Costa Mesa, CA
    Posts
    1,483
    Quote Originally Posted by Rock_Bottom View Post
    Helping my buddy finish up his prerunner build Attachment 38730Attachment 38731Attachment 38732Attachment 38733Attachment 38734Attachment 38735Attachment 38736


    Sent from my iPhone using Tapatalk
    I can't wait to start mine....someday...

    Quote Originally Posted by 78Southwind View Post
    Attachment 38848

    Sent from my DROIDX using Tapatalk 2
    Woah!

  8. #2948
    Quote Originally Posted by BrenMoto View Post
    big ass water tank our special fx and construction crew are building, next we put a submarine in there for next week shoot at Paramount Studios


    Sent from this purdy mouth
    Cool chit man. Love this kind of stuff.

  9. #2949
    Senior Member BrenMoto's Avatar
    Join Date
    Oct 2013
    Location
    Long Beach
    Posts
    241
    Quote Originally Posted by bubblegoose1 View Post
    Cool chit man. Love this kind of stuff.
    NCIS LA I get to see this stuff everyday


    Sent from this purdy mouth

  10. #2950
    Quote Originally Posted by BrenMoto View Post
    NCIS LA I get to see this stuff everyday


    Sent from this purdy mouth
    Jealous. Grew-up in San Fernando. Was cool to watch area filming. Intriguing stuff. Yes, I am old - got to watch multiple CHiPs filmings, backnthaday.

 

 

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •