Quote Originally Posted by Bobbytheboozer View Post
That's crazy. The whole start of the track is new isn't it? That would be so bad ass to do the walk at Pomona
Yea, the first 660' is new concrete. They did a fantastic job with grade and smoothness, but the contraction joints that are sawed in are lousy. Looks like they rushed the cutting of the joints and have spalling already.
Another thing I saw was a little dip at the Concrete/Asphalt transition.


CH3NO2