-
Senior Member
1st project; MAN CAVE/SHOP
Complete 3 car Garage remodel. gutted everything and put it in a container in the driveway. All new electrical including 125amp subpanel, 220 for welders, 220 for air conditioning and 220 for new 60 gallon Compressor (with maxline pre-plumb throughout garage), 2 new 20 amp circuits for receptacles, new 20 amp for landscape lighting transformer. lighting for 10 new fluorescent shop lights, and outside flood lights. getting insulated (R-38 ceilings and R-15 walls). complete re-drywall, texture and paint and an Epoxy floor. Wet Bar with refer, and 32" LCD TV on the wall. All new cabinets and Stainless steel Bar top and bench tops. Shooting for a mid February completion. 
2nd project; BOAT 
Drive rebuild and install external steering, install new gauges, replace rub-rail. Along with the usual repair work... hopefully done by Desert Storm
 Originally Posted by Wendi
Seriously fuck a duck
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
All times are GMT -7. The time now is 03:08 PM.
vBulletin Skin By: PurevB.com
|
Bookmarks