Results 1 to 10 of 39

Threaded View

  1. #7
    Here are some progress pictures, we had the molds transported back to our shop and we will be completing this project in house . In these photos we are installing the stringers and bulkheads for the tanks, we also added drainage through the tank wells so water doesnt get trapped in the sponsons. Once the Imco tanks were installed the floors were placed down as well, prior to installing the deck for easier access and a cleaner job. Now that the deck has been fitted to the hull we will complete the bulkheads and tabbing. Next week we will start flow coating the engine compartment and color sand and polish the hull, then its all about rigging. Since the last boat sold and the customer did not want the 525 package we will be installing that in this boat, should look great with the color combo.

    Name:  IMG_2129.jpg
Views: 3053
Size:  79.4 KBName:  IMG_2146.jpg
Views: 2995
Size:  67.8 KBName:  IMG_2145.jpg
Views: 3030
Size:  63.2 KBName:  IMG_2144.jpg
Views: 3062
Size:  74.0 KBName:  IMG_2143.jpg
Views: 3033
Size:  80.2 KBName:  IMG_2142.jpg
Views: 3041
Size:  69.9 KBName:  IMG_2141.jpg
Views: 3045
Size:  72.7 KBName:  IMG_2138.jpg
Views: 3005
Size:  81.0 KBName:  IMG_2137.jpg
Views: 3058
Size:  88.6 KBName:  IMG_2135.jpg
Views: 3026
Size:  53.5 KBName:  IMG_2134.jpg
Views: 3037
Size:  82.5 KBName:  IMG_2133.jpg
Views: 3011
Size:  82.8 KBName:  IMG_2132.jpg
Views: 3020
Size:  67.0 KBName:  IMG_2131.jpg
Views: 3012
Size:  62.1 KBName:  IMG_2130.jpg
Views: 3090
Size:  83.7 KB[ATTACH=CONFIG]26751[/ATTACH
    Attached Images Attached Images  

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •