Results 1 to 10 of 39

Threaded View

  1. #7
    Here are some progress pictures, we had the molds transported back to our shop and we will be completing this project in house . In these photos we are installing the stringers and bulkheads for the tanks, we also added drainage through the tank wells so water doesnt get trapped in the sponsons. Once the Imco tanks were installed the floors were placed down as well, prior to installing the deck for easier access and a cleaner job. Now that the deck has been fitted to the hull we will complete the bulkheads and tabbing. Next week we will start flow coating the engine compartment and color sand and polish the hull, then its all about rigging. Since the last boat sold and the customer did not want the 525 package we will be installing that in this boat, should look great with the color combo.

    Name:  IMG_2129.jpg
Views: 3110
Size:  79.4 KBName:  IMG_2146.jpg
Views: 3043
Size:  67.8 KBName:  IMG_2145.jpg
Views: 3083
Size:  63.2 KBName:  IMG_2144.jpg
Views: 3111
Size:  74.0 KBName:  IMG_2143.jpg
Views: 3078
Size:  80.2 KBName:  IMG_2142.jpg
Views: 3089
Size:  69.9 KBName:  IMG_2141.jpg
Views: 3090
Size:  72.7 KBName:  IMG_2138.jpg
Views: 3064
Size:  81.0 KBName:  IMG_2137.jpg
Views: 3108
Size:  88.6 KBName:  IMG_2135.jpg
Views: 3075
Size:  53.5 KBName:  IMG_2134.jpg
Views: 3079
Size:  82.5 KBName:  IMG_2133.jpg
Views: 3059
Size:  82.8 KBName:  IMG_2132.jpg
Views: 3076
Size:  67.0 KBName:  IMG_2131.jpg
Views: 3052
Size:  62.1 KBName:  IMG_2130.jpg
Views: 3145
Size:  83.7 KB[ATTACH=CONFIG]26751[/ATTACH
    Attached Images Attached Images  

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •