Havasu,the old house is scraped, the Lot cut 12", pluming is in, foundation poured, rebar tied 12"x 12" mat for the Garage and poured a 5" slab, Lumber dropped today, framing starts tomorrow, Unisource replaced a pole today to bring the Primary in for a Pad Mounted Transformer, for my 325a service, other than that not too much
YL, the Plans are back in the city, Eng. corrections, Fp structural is being drawn (our outdoor Fireplace is a fng Monument), Eng. Methane Mitigation Drwg's are in Orange County Fire Authority, the Lot is graded, Blue Toped, retaining walls completed, wall between the neighbors is completed, submitted a proposal/work request to SCE to move the neighborhood overhead service to underground and that's about it !!
Oh I forgot to mention I started a 800a service install for an Industrial Complex and rewire (4) Units all before the sun goes down today.