-
No shutters....we are told that the new windows are high impact 170 mph rated.We are putting in power screens instead of a cage that will not cover the pool,but will cover part of the patio and we can still open all the sliders.We plan to be part time now and see what makes sense for us.The amount of steel and concrete is pretty amazing because of the new codes.We are in permitting for the dock,hopefully we will have a dock in May.
 Originally Posted by 314joey
Nice looking set-up Kenny, are you guys doing anything about shutters or are you waiting for a later date, I don't want to hi-jack your build thread with any of my stuff, there's a new house going up a few doors down and it's cool to see how they pour the concrete around re-bar in the concrete blocks, I'll start something new about what we did when we moved down here with the house re-model and new dock and stuff, your new place coming along nicely.
Are you guys coming fulltime or parttime, we're staying here 8-9 months and back at LOTO for the Summers.
-
Senior Member
Amazing build, can't wait to see it finished.
Last edited by 78Southwind; 03-23-2014 at 11:22 PM.
-
Senior Member
Second-level pool, now that's how you do it.
-
They wrapped the house and are putting Hardie board on the sides of the house.......Hardie board is a material that is fiber board concrete it looks like old time wood siding,but more durable.Drywall started Last Monday they say 2 weeks to finish the drywall.
-
Looks great!!! Can't wait to see the final!
Sent from my Bat Cave
-
Senior Member
Hardie board is definitely hardy, coming along nicely.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
All times are GMT -7. The time now is 09:10 PM.
vBulletin Skin By: PurevB.com
|
Bookmarks